Loading…
Equilibrium waterline after damage flooding; must remain below margin line / bulkhead deck for SOLAS compliance.
Visualised on the loading-instrument damage-condition output. Master verifies the damaged waterline does not exceed margin line for any worst-case damage scenario.
Authoritative source: SOLAS Chapter II-1 (Construction — Subdivision and stability) ↗
Source: SOLAS II-1
Editorial confidence: how we grade.