Loading…
Abbreviation: EEDI
Design-phase efficiency index (g CO2 per t·nm) required for newbuilds since 2013; tightens in successive phases.
Verified once at newbuilding sea trial; thereafter the certificate stays with the ship. Major modifications (engine de-rating, hull retrofit) trigger a re-verification.
Authoritative source: MARPOL Annex VI (Air pollution) ↗
Source: MARPOL Annex VI Reg. 22; MEPC.308(73)
Editorial confidence: how we grade.