Permanent excavated dock with a gate; fills with water to receive the ship, then is pumped dry for hull work.
Vessel in graving dock typically 12-21 days for class drydocking. Hull washed, anodes / ICCP renewed, propeller polished, antifouling applied. Yard quality control significantly affects coating life.