Electronic chart updates
ECDIS-equipped ships under SOLAS V Reg. 19.2.10 must keep ENCs corrected to the latest available update before sailing and during voyage. The chart-update workflow runs on top of three IHO standards — S-63 (data protection), S-58 (quality validation), and S-101 (next-generation product) — plus the publishing weekly Notice to Mariners and Admiralty Information Overlay (UKHO).
The update cycle
- Base CD / DVD — issued every ~3 months, contains the full ENC catalogue at that issue date. Loaded into the ECDIS as the new starting point.
- Update CD / DVD — issued weekly, contains incremental ENC update files for cells that have changed since the last base. Cumulative; the ECDIS applies them in sequence.
- Online weekly update — most ships now download the same update files via VSAT or Fleet Xpress; many distributors offer a single .zip per week.
- T&P notices (Temporary & Preliminary) — UKHO via the AIO overlay; many other HOs publish their T&P as separate downloadable files. ECDIS displays them as a layer above the base ENC.
- Navigational warnings — broadcast by NAVTEX (Sea Area A1/A2) and SafetyNET (A3/A4); the OOW logs them and updates passage planning live.
S-63 in detail
- · ENC files are encrypted and signed by the producing Hydrographic Office.
- · The user permit ties decryption to a specific ECDIS unit (hardware-bound). Each ECDIS has its own user permit.
- · To switch ECDIS units (e.g. on changeover), the operator obtains a new permit from the chart distributor and reloads cells.
- · Updates are signed; tampered or partial updates are rejected by the ECDIS — preventing route plans being drawn on out-of-date or unverified data.
Crew workflow
- · Daily — OOW reviews navigational warnings (NAVTEX, SafetyNET) and updates passage plan as needed.
- · Weekly — ETO or Chief Mate downloads or installs ENC update batch; verifies all cells along the planned route are at the current ETRS week.
- · Pre-departure — passage plan reviewed against current ENCs and AIO/T&P overlay; chart adequacy confirmed; ECDIS test routine logged.
- · Annual — ECDIS performance test, alarm test, route-checking test per IMO Resolution MSC.232(82) Annex 4.
- · 5-yearly — ECDIS hardware and ENC subscriptions reviewed at vessel renewal class survey.
PSC and vetting findings
- · ENCs not up to date — most-common ECDIS deficiency under Paris MoU CICs.
- · Type-specific ECDIS training missing for the model fitted (MSC.1/Circ.1503/Rev.1).
- · Backup arrangements not in place (independent ECDIS, paper charts, or appropriate folio).
- · Dummy 'route' file from training mode not deleted.
- · T&P / AIO overlay not loaded; navigational warnings not transferred to the passage plan.
Sources: SOLAS Chapter V Reg. 19; IMO Resolution A.817(19) (Performance standards for ECDIS); IMO Resolution MSC.232(82) (Revised PS for ECDIS); MSC.1/Circ.1503/Rev.1 (ECDIS familiarisation and type-specific training); IHO S-63 + S-58 + S-101. See also ECDIS overview, passage planning, ECDIS glossary.
Last verified